When is a route “set” and the train allowed to move?
After a successful call, the route is checked for switches and signals. Movement starts when the route is proven and the signal is open. If conditions are not met, the train waits.
After a successful call, the route is checked for switches and signals. Movement starts when the route is proven and the signal is open. If conditions are not met, the train waits.